Residential Project

Saudi Arabia


BIM modeling, coordination, and LOD development for a large-scale residential apartment project, supporting construction and as-built documentation.

residential project

CHALLENGES

Incomplete IFC inputs at initial stage
Solution: Validated and developed LOD 300 models based on received IFC data
Impact: Established a reliable base model for coordination without design assumptions

 

Interdisciplinary clashes during coordination
Solution: Performed clash detection using Navisworks and coordinated with project stakeholders
Impact: Reduced site conflicts and improved construction readiness

 

Requirement for construction-ready and as-built models
Solution: Enhanced models to LOD 400 for construction and LOD 500 for as-built deliverables
Impact: Enabled accurate execution and provided reliable models for O&M use

TECHNICAL HIGHLIGHTS

Technologies: BIM (LOD 300 / 400 / 500)

 

Tools & Platforms: Revit, AutoCAD, Navisworks, BIM 360

 

Innovations / Optimizations: Efficient LOD progression aligned with project requirements

 

Key Metrics: Coordinated multidisciplinary models delivered from LOD 300 to LOD 500

DELIVERABLES

  • LOD 400 coordinated construction models
  • LOD 500 as-built BIM models
  • Clash detection & coordination reports
  • Model validation based on IFC inputs

Key Highlights:

25k sqm

Project scale

03

LOD stages executed (300 → 400 → 500)

01

Coordinated BIM workflow implemented

100%

Clash-coordinated and validated models

04

Software used

CONCLUSION

By focusing on accurate model validation and coordination without altering the original design intent we ensured a smooth transition from IFC inputs to construction-ready and as-built BIM deliverables.

 

Our approach minimized risks, improved coordination, and supported efficient project execution.